§ 16.14.150. Section A4.106.8 Electric vehicle (EV) charging for new construction.  


Latest version.
  • Section A4.106.8 is not adopted as a Tier 1 and Tier 2 elective measure. Projects must comply with the mandatory electric vehicle supply equipment (EVSE) requirements stated in Section A4.106.8, as amended.
    (Ord. 5481 § 1 (part), 2019)