Palo Alto |
Municipal Code |
Title 16. BUILDING REGULATIONS* |
Chapter 16.14. CALIFORNIA GREEN BUILDING STANDARDS CODE |
§ 16.14.300.
Latest version.
- Section 5.305.1.3 Dual plumbing is added as mandatory and is amended to read:5.305.1.3 Dual plumbing. New buildings and facilities shall be dual plumbed for potable and recycled water systems for toilet flushing when recycled water is available. All building projects for which CPAU recycled water service is available must install dual Plumbing and use recycled water for toilet and urinal flushing when the building area is greater than 10,000 square feet or where installation of 25 or more toilets and urinals is proposed. All projects for which CPAU recycled water service is not yet available must install dual plumbing for use of recycled water for toilet and urinal flushing when the building area exceeds 50,000 square feet or where installation of 50 or more toilets and urinals is proposed.(Ord. 5481 § 1 (part), 2019)