All land-disturbing, land-filling, soil storage, and grading activities, and all temporary construction-related groundwater dewatering, shall be undertaken in a manner designed to minimize surface runoff and erosion, and impacts to downstream waterbodies, and to safeguard life, limb, property, and the public welfare.
(Ord. 5425 § 3, 2018)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');